
The post retrofit PHPP verification work sheet indicates a specific space heat load of 37 kWh/(m2yr), 7 kWh more than the project target of 30 kWh/(m2yr). The reduction in heat loss as a result of a reduction in the effect of thermal bridges post retrofit was an estimate which erred on the side of caution.
No comments:
Post a Comment